Bathroom Remodeling

Women’s Bathroom Remodel

IMG_0859

IMG_0862 IMG_0860 

IMG_0864 IMG_0865 

IMG_0857 IMG_0856

 

Project

Client: Sunset Lakes

Location: Miramar, Fl

Completed: 2016

Description

Full women’s bathroom remodel. We transformed an old-fashioned house type bathroom in a contemporary and modern space, creating a pleasant and comfortable atmosphere. New mosaic tile was installed  through all the bathroom. The shower doors, sinks, partitions and floor were all changed.

 

Wind Condominium Dry Wall

Dry Wall Construction

Project

Client: The Wind Condominium

Location: Miami, Fl

Completed: 2015

Description

All the old dry wall was taken out and reconstructed including the ceilings and walls. Fixtures were put in place and the dry wall was cut two feet and re-established with new base boards. We repainted the whole interior to to refresh the space.

Pool Bar

Project

Client: The Kiezers

Location: Miami Beach, Fl

Completed: 2015

Description

In florida the backyard is everything. the Kiezers liked to host a lot of get togethers with family and friends and renovating their patio was imperative. We installed the new bar along with new fixtures and new tiles. We  refreshed the space by tearing down some walls and installing impact windows. 

Modern Livingroom

Project

Client: The Drexie Family

Location: Miami Beach, Fl

Year Completed: 2013

Description

We gutted the whole living area including the staircase to renovate and bring to life. We added the modern sleek staircase as well as new tiles and added new fixtures. The staircase design required a special approach as the steps came out of the walls. But with skill and effective team it was a smooth build.